AirSolar Power

What Electrical Work Costs

We do not publish a price list, because the honest price for a switchboard, a fault or an EV charger depends on the installation in front of us. Here is exactly what the quote is built from.

Licence 1513126 Fixed quote before work starts Southeast Queensland

Get a fixed quote

Tell us the job — we come back with a fixed price.

What the quote is based on

  • The work itself — a repair, a replacement, or a new circuit
  • Materials: board, breakers, cable size and length, fittings
  • Access: roof space, wall cavities, ceiling type, distance from the board
  • Whether the supply needs isolating by the network
  • Time of attendance — normal hours or an agreed after-hours block
  • Testing and certification, which is part of the job, not an extra

Why a phone estimate is usually wrong

Two houses on the same street can differ by hundreds of dollars because one has a spare way in the board and the other needs a new enclosure, or because the cable route runs through a wall that is double-brick sheeted over. Quotes built from a description are either too high to win the job or too low to finish it.

What we will tell you on the phone

Whether it is a job we do, roughly how long it takes, and whether the pattern suggests a board upgrade is coming. Then we look, and the fixed quote follows. The number does not change after work starts unless the scope changes — and then we stop and talk to you before continuing.

Work that is usually a repair, not an upgrade

  • One tripping circuit caused by a failed appliance
  • A single worn circuit breaker
  • A failed safety switch on an otherwise sound board
  • A dead power point with a loose termination
  • A light fitting replacement

Work that is usually more than people expect

  • Adding load to a board with no spare ways (the board becomes the job)
  • Faults inside a rendered or tiled wall
  • A shed or granny flat needing a sub-board and a long cable run
  • Anything requiring the network to disconnect and reconnect

Common questions

Do you charge to quote?

Call and we will tell you how quoting works for your job — some work is quoted from the phone with a firm number, and larger jobs need a look first. Either way you know before we attend.

Why is there no price list on this website?

Because a figure on a page is not a price for your installation. The quote is built from the actual board, the actual route and the actual load.

Can you give a ballpark over the phone?

We will tell you whether the job is small, medium or a board upgrade — but we will not invent a figure. A made-up number that then doubles on site is worse than an honest 'we need to look'.

Do you do fixed price or hourly?

The quote given before work starts is a fixed price for the scope described. Where a fault genuinely cannot be scoped in advance, that is explained before we start testing.