AirSolar Power

Air Conditioner Electrical Work

Every split system and ducted unit needs a dedicated circuit and an isolator at the outdoor unit. That is licensed electrical work, and it is what we do.

Licence 1513126 Fixed quote before work starts Southeast Queensland

Get a fixed quote

Tell us the job — we come back with a fixed price.

What the electrical work covers

  • Dedicated circuit from the switchboard to the outdoor unit
  • Weatherproof isolator within reach of the unit
  • Switchboard capacity check and safety-switch protection
  • Interconnecting wiring between indoor and outdoor units where required
  • Power for condensate pumps, zone controllers and ancillary equipment

Working with your installer

If an air conditioning company is supplying the unit, we can do the electrical side to their schedule: rough-in before the installers arrive, or connect and commission after. We coordinate the timing so the unit is not sitting on a pallet waiting for a circuit.

The switchboard is usually the constraint

A new air conditioner is often the load that tips an older board over. If there is no spare way, or no safety-switch protection on the circuit, that work comes first. We quote it as part of the job rather than as a surprise on the day.

Servicing side

For air conditioning cleaning and solar panel cleaning, see AirSolar Services — a separate business with its own refrigerant authorisation (ARC AU067842). Electrical work stays with AirSolar Power under licence 1513126.

Common questions

Can your electrician do the whole air conditioning install?

The electrical work, yes. Refrigerant handling and the mechanical install belong with an air conditioning technician — AirSolar Services covers refrigerant work under ARC AU067842.

Do I need a separate circuit for a split system?

Yes. Air conditioners require a dedicated circuit and an isolator at the outdoor unit; sharing a general-purpose circuit is not compliant for a fixed unit of that load.

How long before the installers arrive should the circuit be run?

Before the unit goes on the wall is easiest. We can rough in first or connect afterwards — whichever suits the schedule.