EV Charger Installation

A home charger is a dedicated circuit, not a plugged-in appliance. We check what your supply can carry, install the charger properly, and leave with it charging.

Licence 1513126 Fixed quote before work starts Southeast Queensland

Get a fixed quote

Tell us the job — we come back with a fixed price.

What the install actually involves

  • Check the supply capacity and the switchboard’s spare ways
  • Run a dedicated circuit from the board to the charger position
  • Install the charger with the correct protection and isolation
  • Test and commission, then confirm the vehicle charges
  • Set the charger’s load management so the house does not trip when other appliances run

Single-phase or three-phase

Most homes are single-phase, which limits charging speed to what that supply allows. Three-phase properties can charge faster but need a three-phase charger and the board to match. We tell you what your property can support rather than selling a charger it cannot run.

Where the charger goes

The position decides the cost as much as the hardware. Close to the board, under cover, with the cable reaching the car without stretching, and out of the weather where possible. If the garage is detached or the parking is at the far end of the block, cable route and size are the variables — we quote from the actual route, not a guess.

Existing solar and battery

If you have solar, charging during the day uses your own generation instead of exporting it. Some chargers integrate with the inverter or a load controller to do that automatically. We will tell you whether your system can be integrated or whether the charger has to manage alone.

Common questions

Can I just plug a charger into a power point?

A portable charger on an existing socket is not a permanent installation and sustained charging loads sockets that were never designed for it. A dedicated circuit is the safe route and it is what an insurer expects to see.

Will I need a switchboard upgrade?

Sometimes. The load check decides it: if the board has no spare capacity or no safety-switch protection on the new circuit, that is the work that has to happen first.

Do you supply the charger?

We can supply and install, or install a charger you have bought. Either way the circuit, protection and commissioning are the licensed part.

How long does it take?

A straightforward install near the board is a half-day. Longer cable routes, three-phase work or a board upgrade add time — the quote states the expected duration.