A switchboard is the one part of the electrical installation that protects everything else. Ours are rebuilt to current standards, fully labelled, and tested before we leave.
Tell us the job — we come back with a fixed price.
The old board comes off and a new enclosure goes on with individual circuit protection, a main switch, and safety switches on the circuits that need them. Every circuit is tested and labelled with what it actually feeds — not what the last electrician guessed.
Where the supply authority needs to disconnect and reconnect, we arrange it and tell you what the day looks like, including how long the power will be off.
Not every old board needs replacing. If the board is sound and the problem is one worn circuit breaker or a loose neutral, replacing that part is the honest answer. We will say so — a switchboard upgrade is priced on what the installation actually needs.
A typical single-phase domestic board is a day's work, including testing and labelling. Larger boards, three-phase supplies or a supply authority disconnect can add time — we tell you the expected duration before booking.
Yes. Power is off while the board is changed, typically several hours. We give you the window in advance so fridges, medical equipment and home offices can be planned around it.
Not always, but capacity and safety-switch protection both need checking first. A load check tells you whether the existing board can take the new circuit or whether the board is the constraint.
It depends on the board, the number of circuits and whether the supply needs disconnecting. We quote a fixed price after inspecting — no figure is published here because a made-up number is worse than none.